Here in the frame you can see the pier and electrical conduit. We will have to run wire below the decking to the pier to supply power as wells as RS 232 and USB. Per county code we will have to run conduit there as well.
The frame
Unforeseen Issue
The outside main post were somehow moved off-center while they were curing. As best we can figure, either a student or critter or both had a hand it. This caused the decking boards to not line up with with the post. We'll have to develop some type of patch to ensure longevity and stability of the post.
A wedge inserted into the the post might be the best option at this point.
There have been several little issues that have popped up during this build. Some major, some small, but all annoying. We are still on schedule and under budget, so I guess we can't complain.
A wedge inserted into the the post might be the best option at this point.
There have been several little issues that have popped up during this build. Some major, some small, but all annoying. We are still on schedule and under budget, so I guess we can't complain.